Arlington · Northern Virginia
(703) 552-7565Start a Project

36+ Years · Award-Winning · Arlington Design-Build

Arlington, VA · ADU Permit

Arlington ADU Permit: The Part of Your ADU Project That Most Contractors Get Wrong

The permit process is where most Arlington ADU projects stall. Berriz Design Build has navigated Arlington County's ADU approval process for over 36 years — and we know exactly how to get it right the first time.

The Berriz Perspective

Most contractors treat the ADU permit as an administrative formality. It isn't. In Arlington County, the permit review process is substantive — reviewers check zoning compliance, structural adequacy, utility capacity, and code conformance in detail. A permit package that's missing documentation, uses incorrect setback calculations, or fails to address Arlington's specific ADU ordinance requirements will be returned for revision — adding weeks or months to your project timeline. Berriz Design Build prepares ADU permit packages that are complete, accurate, and formatted to Arlington County's specific requirements. We've submitted hundreds of permit packages to Arlington County over 36 years. We know what gets approved and what gets sent back.

Common Questions

What Arlington Homeowners Ask About ADU Permit

Discovery & Eligibility

What permits are required for an ADU in Arlington, VA?

An Arlington ADU requires a building permit (covering structural, electrical, plumbing, and mechanical work), zoning approval confirming compliance with Arlington's ADU ordinance, and a certificate of occupancy upon completion. Berriz Design Build manages all permit applications and inspections.

How long does the ADU permit process take in Arlington?

Initial permit review in Arlington County typically takes 6–10 weeks. If revisions are required, each revision cycle adds 3–6 weeks. Berriz Design Build's thorough permit packages minimize revision cycles — the most common cause of ADU project delays.

Cost & Permitting

What does Arlington County review in an ADU permit application?

Arlington County reviews zoning compliance (setbacks, lot coverage, height), structural plans, electrical and plumbing plans, energy code compliance, and conformance with Arlington's specific ADU ordinance. All components must be complete and accurate for the permit to advance.

Can I apply for an ADU permit myself in Arlington?

Yes, but it's not recommended without professional experience. Incomplete or non-compliant permit packages result in revision cycles that significantly delay projects. Berriz Design Build prepares and manages all ADU permit applications as part of our integrated design-build service.

Process & Partnership

What are the zoning requirements for an ADU permit in Arlington?

Arlington's ADU zoning requirements include minimum lot size, setback distances from property lines, maximum ADU square footage (typically 35% of primary home or 1,000 sq ft, whichever is less), height limits for detached ADUs, and owner-occupancy requirements. Berriz Design Build evaluates your specific lot's compliance before design begins.

Why choose Berriz Design Build for ADU permitting in Arlington?

36+ years of Arlington County permit experience, an in-house design team that prepares complete permit packages, and a track record of first-submission approvals. We treat the permit process as a core competency, not an afterthought.

Where We Build

ADU Permits across Northern Virginia

Arlington is home. These are the communities we build in most often — each with its own permitting office, review timeline and design vernacular.

Build it with a team that has done it 36 years running.

Design, permitting and construction handled by one accountable group — no hand-offs, no finger-pointing.

Start the Conversation

Tell us about the project

Every Berriz engagement opens the same way: a conversation about how you actually use the space, what has to change, and what the realistic range looks like. No pressure, no obligation.

36+Years in Northern Virginia
1Team, design through build
24/7AI agent for quick answers
Call (703) 552-7565

Request a consultation

We reply within one business day.

US mobile or landline, 10 digits

Submitting sends your details to the Berriz team by email and files them in our CRM. We never sell or share your information.